Print

International Management Plan for the Elbe River Basin District

At the end of 2015, the updated „International Management Plan for the Elbe River Basin District“ (Part A) for the period 2016 – 2021 was published on the ICPER website .

The following important water management issues at international level have been established for updating the plan for the period 2016 – 2021:

  • improving the surface water structure and passability (target areas for re-establishing ecological passability are shown in the map.)
  • reduction of significant nutrient and pollutant loads

Updating the plan, following documents within the framework of the results of the Management Plan 2009 were used:

The updated „International Management Plan for the Elbe River Basin District“ (Part A) for the period 2016 – 2021 is available on the website of the ICPER (only in German or Czech - circa 11 MB). In addition, the plan was published in printed version in February 2016.

Information Sheet

A summarised informationen on the updated „International Management Plan for the Elbe River Basin District“ (Part A) for the period 2016 – 2021 gives you the Information Sheet No. 5 for the Water Framework Directive.